Medidor de tierra PCE-ET 3000
- Code / Model:
- Manufacturer: PCE Instruments
- Department:
- Category of products:
- Sub-category: Instruments and equipment
- You've seen it before.: 1
The following information shall be provided:
Ground gauge for checking ground take (resistance/voltage against ground) of houses and buildings
Ground gauge for checking ground take (resistance/voltage against ground) of houses and buildings
Ground gauge for measuring in lightning rods or ground gauges for lightning rods for all types of buildings. The ground gauge has a sealed housing and meets the safety requirements of VDE 0413 required for technical service personnel outside. The ground gauge is suitable for meas
- LCD screen with 3 1⁄2 positions (max. 1999)
- High precision telurometer
- Battery/range gauge
- Hold the data
- Safety: IEC-1010-1 and CAT III 300 V
- Very good quality telurometer
- Optional ISO calibration for the tellerometer
- High precision telurometer
- Battery/range gauge
- Hold the data
- Safety: IEC-1010-1 and CAT III 300 V
- Very good quality telurometer
- Optional ISO calibration for the tellerometer
| Functions | Rate | Resolution adopted by the Council | Accuracy |
| Ground resistance | 0 ... 19,99 0 ... 199 0 ... 1999 Ω |
10 Other, not further worked than hot-rolled 1 Ω |
± 2% + 2 positions |
| Air conditioning | 0 ... 200 V AC 50/60 Hz |
0,1 V | ± 3% + 2 positions |
| The lower limit of med. | 0,01 Ω | ||
| Measurement current | The following is the list of the following: | ||
| Response time | About 2.5 seconds | ||
| Measurement quota | 0,4 s | ||
| Overranking of the rank | In case of overload, a "1" is displayed. | ||
| Food | 6 x 1.5 V AA batteries | ||
| Dimension | Other, of a width of not more than 150 mm | ||
| Weight | 560 g | ||
| Security | The following information is provided in the Annex to Regulation (EU) No 1071/2013: Category of installation III |
||
| The following is the list of the following: | The following information is provided for in the Annex to Regulation (EU) No 580/2012: The Commission shall adopt implementing acts in accordance with Article 21 of Regulation (EC) No 1272/2009. |
||