Three-phase meter Enel Endesa CERT 1

Three-phase meter Enel Endesa CERT 1

Three-Phase and Single-Phase Energy Meters

ENEL ENDESA CERT1 10(80) A. 230/400 V. PLC and CERVANTES relay.

ENEL ENDESA CERM1 0,25-5(60) A. 230 V. PLC and CERVANTES relay.

Single-Phase Meter for Bi-Directional Electricity Generation

Authorized single-phase meter for bi-directional electricity generation with tele-registration.

CERM1: Single-Phase Energy Meter

  • Active and reactive energy measurement
  • Hourly discrimination
  • Telemanagement system "meters and more" developed by ENEL

The CERM1 meter is only authorized for ENDESA (ENDESA certification included).

Benefits of Installing Your Own Meter

Install your own meter, eliminate monthly rental fees from the company.

Do not add the energy produced by your photovoltaic / wind installation. Your digital or analog meter for a fully legal bi-directional meter that complies with Spanish regulations RD1110/2007.

How it Works

When you receive the meter, call your ENDESA service point to request a change of your meter to an authorized bi-directional meter owned by you. The change must be made by an authorized installer indicated by them. From here, within 10 to 30 days, ENDESA will come to program and seal the meter, and you can enjoy your photovoltaic / wind installation self-consumption without paying for excesses generated.


Products Related