.

Siemens Gamesa instala en Málaga aerogeneradores

For Alfanar Energy Siemens Gamesa will install twelve wind turbines, which total 32 megawatts (MW):nine turbines in the La Escalereta II project, expanding the wind farm in Cañete la Real (Málaga) and with a capacity of 23.5 megawatts, and another three in the La Estancia wind farm, located in Cádiz, which the wind turbine manufacturer will maintain and operate for twenty years.